BIOXAS-IMAGING

News | Beamline Updates

Beamline Updates
Aug. 4, 2021
The BioXAS sector was experiencing vacuum issues during the previous cycle. Front End mask was replaced during the spring shut-down.
Beamline Updates
Jan. 25, 2021
The installed air conditioning system will provide the optimum temperature in the enclosures aiding beam stability over time.
Beamline Updates
Jan. 22, 2021
The constructed wall provides now a separate space for the Spectroscopy and Imaging beamline, respectively.